
The Lagos State Commissioner for Transportation, Mr Oluwaseun Osiyemi, says the Babajide Sanwo-Olu administration has made significant progress in developing road, rail and water transportation infrastructure across the state.
Osiyemi made this known on Monday at the 2026 Ministerial Press Briefing in Lagos to commemorate the third year of Gov. Babajide Sanwo-Olu’s second term in office.
He said the government remained committed to providing residents with an integrated multimodal transportation system that is seamless, safe, affordable, sustainable and inclusive.
According to him, the administration will continue to engage residents and invest in transport infrastructure to enhance mobility and support socio-economic development.
“Our promise to Lagos residents is to continue to provide and plan the best transportation system for all, in a manner that will boost the socio-economic development of the people and the state,” he said.
Osiyemi said the state was upgrading public transport infrastructure, including Bus Rapid Transit corridors and terminals, Quality Bus Corridors, rail projects and waterways facilities.
He said the BRT infrastructure from Doyin-Orile to Mile 2 along the Lagos-Badagry Expressway was 84 per cent completed, while the Iyana Ipaja Bus Terminal had reached 28 per cent completion.
According to him, the projects will improve mobility, reduce traffic congestion, enhance affordability and safety, and stimulate economic development.
Osiyemi said the Lagos Metropolitan Area Transport Authority was implementing several Quality Bus Corridor projects to improve mass transit efficiency and reduce travel time.
He listed the ongoing corridors as Mile 2, Alapere-Ketu, Ojuelegba, Cele and Abule Egba.
He said the projects feature dedicated and regulated bus lanes, modern shelters and terminals, improved pedestrian walkways and crossings, as well as traffic signal and junction improvements.
On rail transportation, Osiyemi said Phase II of the Lagos Rail Mass Transit Blue Line would extend the corridor from Mile 2 to Okokomaiko, with track construction, station development and power installation ongoing.
He said the 37-kilometre Red Line rail project from Marina through Oyingbo to Agbado was being strengthened with the procurement of 24 new coaches arranged in three sets of eight-coach trains.
According to him, each train set will carry more than 500 passengers.
He added that a feasibility study was ongoing for Phase II of the Red Line from Oyingbo to National Theatre to connect with the Blue Line.
Osiyemi said the 68-kilometre Green Line rail project would connect Marina to the Lekki Free Trade Zone through Victoria Island, Lekki, Ajah and Sangotedo, with about 17 stations.
He said the state had signed a Memorandum of Understanding with China Harbour Engineering Company for the project.
According to him, the Green Line is designed to transport 35,000 passengers per hour, while the Federal Executive Council has approved funding for Phase I.
On water transportation, Osiyemi said the Lagos Ferry Services was nearing completion of a boat maintenance and dry dock facility at the Mile 2 Ferry Terminal.
He said boat trailers were also being constructed to facilitate dry-docking and repairs.
The commissioner added that solar-powered portable office cabins were being installed at Ijede, Ebute-Ero and Liverpool jetties to improve working conditions for staff.
He said the CMS Pontoon Jetty had also been upgraded to enhance passenger boarding and disembarkation.













