shippingposition
  • Home
  • News
  • Editorial
    • Vox Pop
  • Maritime safety
  • Oil and Gas
  • Personality
  • Health
No Result
View All Result
shippingposition

Home » REVEALED: Why There May Be No Rail Link To Lekki Deep Seaport

REVEALED: Why There May Be No Rail Link To Lekki Deep Seaport

Rail Will Cost More Than Lekki Port Itself - Official

by Joshua
September 5, 2022
in Featured, News

Oluyinka Onigbinde

Findings by Shipping Position Daily have revealed that the huge funding requirement may mar the much-expected rail link to the Lekki deep seaport in Lagos. This is because it has been revealed that rail connection to the deep seaport may gulp over $1.8 billion; a cost higher than the $1.5 billion which is the total cost of constructing the deep seaport.

Lekki-Deep-SeaThe port, which is expected to commence commercial operations this month (September) has received criticisms from maritime industry stakeholders over the mode of cargoes evacuation, owing to the state of the road leading to the port.

Many residents of Lekki area of Lagos have expressed fear that since the Lekki port is not connected to the rail line, cargo evacuation would compound the already congested Lekki-Epe road, a situation that could replicate the chaos and gridlock being witnessed in Apapa and Tin Can Island Ports axis.

When our correspondent visited the port location, he found out that only a single lane road connects the facility and several other industries in the area such as Dangote Fertilizer and Refinery Plant, Dano Milk, Kelloggs, Indomie, Raffles Oil, and Insignia Prints, to the main Lekki-Epe highway. This has been the case for

Our correspondent also observed that the axis is witnessing a rapid development of over 50 residential estates.

Checks by our correspondent also confirmed that the Free Trade Zone alone has over 800 hectares of land to accommodate nine designated industrial zones.

The Free Trade Zone will host a new international airport, Eleganza Industrial City, and Bolore Transport and Logistics, among others. This indicates that without rail and alternative roads, the volume of traffic on existing roads would increase remarkably and may mar operations at the Lekki portfacility.

However, addressing freight forwarders under the auspices of Association of Nigeria Licensed Customs Agents (ANLCA), who paid a courtesy visit to the port recently, the head regulatory and procurement department, Lekki deep seaport; Mr Daniel Odibe, said the it will cost about $1.8 billion to link the port with rail.

He informed that the rail linkage will start from the Kajola rail terminal in Ogun state to the deep seaport, thereafter to Apapa port.

Speaking further, he said the cost of linking the rail from Kajola to the Deep Seaport will cost $ 1.2 billion, while linkage from the Lekki deep seaport to Apapa will cost $600 million totalling $1.8billion.

Odibe lamented that the 41.8Billion is higher than the cost of Lekki port.

He further said that, owing to the bad state of the road and the unavailability of the rail at the moment, the port will rely on ocean going barges for cargo evacuation.

Read Also:  Minister Of Transportation Vows To Disburse CVFF Before December

“With this, we will be relying on ocean going barges, we need ocean going barges purposely built for such, we believe a lot of cargoes will be moved by barges before the rail comes in, the ocean going barges will come to our rescue pending when the road will be completed”

The Lekki port top man however stated that construction on the coastal road has begun, but said the road construction is expected to last 18 months, which means that the construction of the road leading to the port may not be completed until 2024.

He added that the port will be fully automated when it begins operations and will have the capacity to handle 1.2 million cargo throughputs annually.

Asked about the state of the road, he said, “as you can see, construction is ongoing, the coastal road that is from the Lagos free zone to Eleko, is about 23km, the road construction will take about 18 months”.

He further informed that upon completion, the deep seaport will be able to generate over 170,000 direct and indirect jobs and could generate $4.5 billion annually or $201 billion in 45 years.

shippingposition

Kindly like us on Facebook/twitter


Tags: Rail Link

Related Posts

Customs Honours Retiring DCG Omale, Celebrates Legacy of Service

Customs Unveils Special Operations Against Vegetable Oil Smuggling to Protect Local Investments

June 11, 2026
AMSAY @ 10: Stakeholders Seek Stronger Maritime Succession Plan as Industry Honours Mentors, Outstanding Students

AMSAY @ 10: Stakeholders Seek Stronger Maritime Succession Plan as Industry Honours Mentors, Outstanding Students

June 11, 2026
NEPZA Tasks States On Free Trade Zones Scheme

NEPZA Assures Investors Of Support Amid Security, Tax Concerns

June 11, 2026
Customs Honours Retiring DCG Omale, Celebrates Legacy of Service

Customs Honours Retiring DCG Omale, Celebrates Legacy of Service

June 11, 2026

Latest News

Development of Lekki Port Phase 2 to Begin Soon, Says Sanwo-Olu

June 11, 2026

Customs, Police Deepen Collaboration on National Security

Seafarers Documentation, Digitization Takes Center Stage At Nigeria, Gambia Forum

Customs Unveils Special Operations Against Vegetable Oil Smuggling to Protect Local Investments

AMSAY @ 10: Stakeholders Seek Stronger Maritime Succession Plan as Industry Honours Mentors, Outstanding Students

NEPZA Assures Investors Of Support Amid Security, Tax Concerns

Customs Honours Retiring DCG Omale, Celebrates Legacy of Service

NNPC Foundation Symposium: Communication Key to Building Climate Resilience, Says UniAbuja Dean

Open Registry Will Boost Revenue, Jobs, Fleet Growth — Expert

AfCFTA: FG Opens $1 Bn Financing Window For Nigerian Businesses To Accelerate  Export growth

Stakeholders Seek Inclusive Pathways For Sustainable Ocean Economy

NEPZA Seeks Obong Of Calabar’s Support To Expand Free Trade Zone Operations

kindly like our Facebook page

Health

NCDC Places States On High Ebola Preparedness Alert Over Importation Risk
Health

NCDC Places States On High Ebola Preparedness Alert Over Importation Risk

June 1, 2026

The Nigeria Centre for Disease Control and Prevention (NCDC) has placed several states on high Ebola preparedness alert after a...

It’s The Season Of Corn

It’s The Season Of Corn

June 1, 2026
Ovarian Cancer: Why Nigerian Women Are Dying In Silence

Ovarian Cancer: Why Nigerian Women Are Dying In Silence

May 18, 2026
Beware: ‘Agbo’ Can Kill Asthmatics, Inhalers Save Lives — Pulmonologist

WARNING: No Amount Of Sex, Special Diet Can Prevent Prostate Cancer

May 11, 2026
Beware: ‘Agbo’ Can Kill Asthmatics, Inhalers Save Lives — Pulmonologist

Beware: ‘Agbo’ Can Kill Asthmatics, Inhalers Save Lives — Pulmonologist

May 11, 2026
Why Nigerians Must Reduce Excessive Salt Intake – Public Health Expert

Why Nigerians Must Reduce Excessive Salt Intake – Public Health Expert

May 4, 2026
Nigeria, 9 Others Account For 70% Global Hepatitis B deaths —WHO

Nigeria, 9 Others Account For 70% Global Hepatitis B deaths —WHO

May 4, 2026
Your Stool Determines The State Of Your Health

World Liver Day 2026: Low Awareness Threatens Fight Against Liver Disease – Experts

April 27, 2026
Your Stool Determines The State Of Your Health

Your Stool Determines The State Of Your Health

April 27, 2026
WARNING: High-Salt Diet May Speed Memory Decline In Men

WARNING: High-Salt Diet May Speed Memory Decline In Men

April 20, 2026

© 2021 Shippingposition

Navigate Site

  • Home
  • About Us
  • Contact us
  • Privacy Policy
  • Editorial Policy
  • Sitemap
  • Terms

Follow Us

No Result
View All Result
  • News
  • Coast To Coast
  • Oil and Gas
  • Maritime Education
  • The Terminals
  • Maritime safety

© 2021 Shippingposition