shippingposition
  • Home
  • News
  • Editorial
    • Vox Pop
  • Maritime safety
  • Oil and Gas
  • Personality
  • Health
No Result
View All Result
shippingposition

Home » Operators Lament Delay In Discharge Of Petroleum Vessels At Ibafon

Operators Lament Delay In Discharge Of Petroleum Vessels At Ibafon

by Joshua
August 3, 2014
in Uncategorized

Stakeholders operating at the various tank farms around the Ibafon axis on the Apapa-Oshodi expressway have said that petroleum vessels are now delayed from discharging their content at the tank farms because there is no space to accommodate the products.
 
The operators attributed the vessel delay to the perennial traffic congestion around the axis, a situation which according to them has reduced the number and rate at which trucks are loaded from the depots.
 

Stakeholders operating at the various tank farms around the Ibafon axis on the Apapa-Oshodi expressway have said that petroleum vessels are now delayed from discharging their content at the tank farms because there is no space to accommodate the products.
 
The operators attributed the vessel delay to the perennial traffic congestion around the axis, a situation which according to them has reduced the number and rate at which trucks are loaded from the depots.
 
In addition to putting the roads in shape, the operators have equally called on the Federal Government and the Lagos State Government to consider the construction of an overhead bridge along the axis in order to ease traffic.
 
A NUPENG executive at Ibeto Tank Farm; Comrade Chris Iyasere told Shipping Position Daily that there have been delay for vessels to berth and discharge at the various depots. He said that petroleum trucks loaded at the tank farms usually stay two days in the depot before they can find their way out.
 
Comrade Iyasere said that relocating the tank farms is not the best solution to the traffic problem, but that government should take immediate action to repair the roads temporarily or else Apapa would be completely cut-off from the rest of Lagos.
 
"The direct effect for now is that where we expect to have 20 vessels, because of the product in the tank farms that have not been evacuated as a result of the bad roads, there is delay of some vessels waiting to berth. When they fix the road, the number of trucks we are loading will increase"
 
"What we have been experiencing some few weeks back is that we load trucks and it takes two days to leave the depot, this is because containers fall on the bad roads, tankers will fall on tankers and the roads will be completely blocked" he lamented.
 
He reiterated that the relocation of tank farms or the reduction in the number of trucks loaded at the Lagos tank farms as suggested by the Federal Government is not the solution to the problem, rather, the only way out is to repair the road.
 
"If they have to relocate the tank farms, let them do the cost analysis, moving the tank farms or building an overhead bridge to divert trucks and cars, if an overhead bridge is constructed and tankers are passing down while cars pass on the bridge, then the problem is solved"
 
"But if they relocate the tank farms to any area, very soon, development will get to these areas too" he said.
 
Also speaking with our correspondent, a petroleum marketer, Mr. Fidel Aisodioune pointed out that the multiplier effect of what the roads have caused and is still going to cause if not quickly addressed is enormous.
 
He said that investors are being made to pay high demurrage on vessels queuing up at berth and that this is not good for investment.
 
"If a vessel comes in and the depot is not empty, such vessel cannot berth or discharge, this leads to the investor paying demurrage"
 
"Tank farm owners are investors, and as investors you will always want returns on your investment, if you cut the supply of products to the tank farms, you are indirectly asking them to start retrenching people, once they don't operate to their maximum capacity, then they cannot generate funds to sustain the size of labor they have"
 
"As we speak, the tank farms in this area directly engages over 5,000 people, while indirectly, over 10,000 are engaged, then if you follow the tree diagram, you will realize that over 10 million Nigerians depend on the Apapa-Coconut axis to sustain"
 
"The best option is for government to wake up to their responsibility", Fidel advised.
 
 


Related Posts

Eko Bridge: FG Orders Closure Of Whole Carriageway

May 7, 2026

Dozens Feared Missing After Canoe Capsizes In Western Uganda

April 30, 2026

OPINION: CVFF Disbursement and the Burden of Responsibility: Why Repayment Discipline Matters for Nigeria’s Maritime Future  

April 30, 2026
CMSN Inducts 40 Professionals, Boosts Local Capacity in Marine Surveying

CMSN Inducts 40 Professionals, Boosts Local Capacity in Marine Surveying

April 6, 2026

Discussion about this post

Latest News

Nigeria Customs Organises Training For Journalists On Trade Modernisation Project

Nigeria Customs Organises Training For Journalists On Trade Modernisation Project

May 8, 2026

Navy Charges Junior Officers On Tactical Leadership, Operational Efficiency

Navy Confiscates 1,800 Litres Of Illegal Diesel In Lagos Raid

Macron Urges Instant Reopening Of Hormuz Strait

Vessels Expected At Lagos Ports As At 8th May, 2026

Onigbinde Defeats Iwori, Emerges New MARAN President

Customs Agents Petition IGP Over Maritime Police Interference In Cargo Clearance

Eko Bridge: FG Orders Closure Of Whole Carriageway

Nigeria Customs Intensifies Crackdown On Terrorism Funding, Illicit Financial Flows

French Vessel Attacked In Strait Of Hormuz, Crew Injured -Reports

Nigerian Navy, U.S. Delegation Strengthen Maritime Security Partnership

Vessels Expected At Lagos Ports As At 7th May, 2026

kindly like our Facebook page

Health

Your Stool Determines The State Of Your Health
Health

World Liver Day 2026: Low Awareness Threatens Fight Against Liver Disease – Experts

April 27, 2026

Health experts have raised concerns over the low level of awareness surrounding liver diseases, warning that the condition had remained...

Your Stool Determines The State Of Your Health

Your Stool Determines The State Of Your Health

April 27, 2026
WARNING: High-Salt Diet May Speed Memory Decline In Men

WARNING: High-Salt Diet May Speed Memory Decline In Men

April 20, 2026
8% Nigerians Live With Diabetes – Official

8% Nigerians Live With Diabetes – Official

April 20, 2026
SALT USAGE ADVISORY: WHO, NAFDAC Warns Against Excessive Salt Intake, Recommends 1 Teaspoon Of Salt Daily

Some Health Benefits of Tomatoes?

April 13, 2026
SALT USAGE ADVISORY: WHO, NAFDAC Warns Against Excessive Salt Intake, Recommends 1 Teaspoon Of Salt Daily

SALT USAGE ADVISORY: WHO, NAFDAC Warns Against Excessive Salt Intake, Recommends 1 Teaspoon Of Salt Daily

April 13, 2026
Sleep Deprivation Root Cause Of Many Disease – Says Physician

Health Benefits Of Consuming Garden Egg

March 23, 2026
Sleep Deprivation Root Cause Of Many Disease – Says Physician

Sleep Deprivation Root Cause Of Many Disease – Says Physician

March 23, 2026
Report Finds Hypertension Affects Up To 40% Of Nigerian Adults In 2025

Stress Management: Psychiatrist Identifies Effective Coping Mechanisms

March 16, 2026
Report Finds Hypertension Affects Up To 40% Of Nigerian Adults In 2025

Report Finds Hypertension Affects Up To 40% Of Nigerian Adults In 2025

March 16, 2026

© 2021 Shippingposition

Navigate Site

  • Home
  • About Us
  • Contact us
  • Privacy Policy
  • Editorial Policy
  • Sitemap
  • Terms

Follow Us

No Result
View All Result
  • News
  • Coast To Coast
  • Oil and Gas
  • Maritime Education
  • The Terminals
  • Maritime safety

© 2021 Shippingposition