shippingposition
  • Home
  • News
  • Editorial
    • Vox Pop
  • Maritime safety
  • Oil and Gas
  • Personality
  • Health
No Result
View All Result
shippingposition

Home » Marine Beach Bridge Apapa Rehabilitation Completed, Opens To Traffic Next Week- Works Controller

Marine Beach Bridge Apapa Rehabilitation Completed, Opens To Traffic Next Week- Works Controller

by Joshua
October 1, 2020
in Uncategorized

.Ongoing rehabilitation of Marine Beach Bridge, Apapa

 

The Marine Beach Bridge, Apapa, is almost completed for the Apapa bound lane under repairs to be reopened to traffic in a week’s time says the Federal Controller of Works in Lagos, Mr Olukayode Popoola.

Popoola told newsmen on Wednesday that 10 expansion joints and 60 bearings had been replaced and final asphalting done on the 250 metres stretch under rehabilitation.

He said that the repairs were being carried out in phases and the first phase rehabilitation had been completed and ready to be opened to traffic.

“The 250 metres that we closed in April on Marine Beach Bridge, Apapa is completed.

“We have laid the asphalt; the remaining work now is to put the concrete to hold the expansion joint down which will be done before weekend.

”So hopefully next week, that is the first week in October, that section would be opened to traffic because all the work on that section has been completed.

“We changed 10 number expansion joints making a total of 110 meters and we replaced about 60 bearings and put about 250 metres of asphalt and did jacketing of the piers at that section.

”Jacketing of the piers means that we increased the width by putting the reinforcement and then put the concrete and then where we needed to do the repairs, we did the skin repairs.

“It is like grafting of the human body, we also do skin repairs for the piers, where the concrete is peeling, we replace with fresh ones.

”So we have completed the section and will open it to traffic next week,” he said.

Popoola added that the construction would soon move to the outbound Apapa lane where the same rehabilitation process was expected to be carried.

The over 40 year-old  Marine Beach Bridge was damaged by a fire incident and was first awarded for repairs in 2012.

It went through another round of six months repairs in 2017, before the current ongoing rehabilitation that began in phases in 2020 with the entire repairs expected to be completed in March 2021.

 


Related Posts

MSC

WEEKLY GLOBAL MARINE INCIDENTS

March 23, 2026
MONDAY INTERVIEW: “Institutional Transformation Cannot Succeed Without Motivated Personnel”--- Dr Pius Akutah

Shippers’ Council Urges Dialogue as Freight Forwarders Picket MSC Over Tariff Hike

March 19, 2026

Nigeria Customs Technical/Hangar Services Posts 172% Revenue Surge, Earns CGC Commendation

February 27, 2026
CVFF Portal Unveiling

CVFF Portal: Game-changer For Indigenous Ship Owners’ Financing – Oyetola

January 23, 2026

Discussion about this post

Latest News

MSC In Exclusive Talks To Buy Bolloré’s African Logistics For $6.4 Billion

MSC Bows to Regulator, Suspends Controversial Tariff Hike

March 25, 2026

Institutional Discipline, Stakeholder Integration Will Drive NSW’s Success – Centre

Nigerian Navy Seeks Danish Backing for Multinational Maritime Task Force in Gulf of Guinea

NNS Beecroft Hands Over Two Suspected Stowaways to Immigration Service

Iran Says Strait Of Hormuz Remains Open To Global Shipping Except ‘Enemy-Linked’ Ships

PORT MODERNIZATION: Repairing The Leaking Bucket Of Nigeria’s Trade

Western Ports Police Broker Peace Talks Amid Rising Shipping Charges Dispute

Vessels Expected At Lagos Ports As At 25th March, 2026

NSW to Shift Nigeria from Fragmented, Inefficient Trade Processes to Coordinated, Technology-Driven System–FG

Shippers’ Council Writes MSC, Insists On Suspension Of New Tariff

Navy Rescues 7 After Boat Collision In Bayelsa

Report Of Bandits Drowning In Sokoto River Is Fake News – NIWA 

kindly like our Facebook page

Health

Report Finds Hypertension Affects Up To 40% Of Nigerian Adults In 2025
Health

Stress Management: Psychiatrist Identifies Effective Coping Mechanisms

March 16, 2026

A consultant Psychiatrist, Dr Stephen Oluwaniyi, has identified stress as a risk factor for developing mental health conditions, advising that...

Report Finds Hypertension Affects Up To 40% Of Nigerian Adults In 2025

Report Finds Hypertension Affects Up To 40% Of Nigerian Adults In 2025

March 16, 2026
Lemons Are Among Fruits That Have The Highest Healing Powers Of Diseases On Earth

Lemons Are Among Fruits That Have The Highest Healing Powers Of Diseases On Earth

March 9, 2026
Nigeria Reports Higher Lassa Fever Death Rate

Nigeria Reports Higher Lassa Fever Death Rate

March 9, 2026
The Big Question: Can Diabetes Be Reversed?

Some Early Warning Signs of Diabetes That You Don’t Know, But Should

March 2, 2026
Why Your Favourite Seasoning Cubes May Be Hurting Your Kidneys

Why Your Favourite Seasoning Cubes May Be Hurting Your Kidneys

February 23, 2026
SHOCKING: FIIRO Links High Rates of Organ Failure, Cardiovascular Diseases in Nigeria to Local Grinding Machines

SHOCKING: FIIRO Links High Rates of Organ Failure, Cardiovascular Diseases in Nigeria to Local Grinding Machines

February 23, 2026
MONDAY INTERVIEW: Oyebamiji Did Not See The Media As Adversaries, But As Partners In Development”—Minister Oyetola

DANGER: 11% Of Nigerians Have Kidney Disease – Experts

February 16, 2026
Snakebite Envenoming, Silent Killer In Nigeria – Expert Warns

Snakebite Envenoming, Silent Killer In Nigeria – Expert Warns

February 9, 2026
World Cancer Day: Cancer Not Always Death Sentence  Says Oncologist

World Cancer Day: Cancer Not Always Death Sentence  Says Oncologist

February 9, 2026

© 2021 Shippingposition

Navigate Site

  • Home
  • About Us
  • Contact us
  • Privacy Policy
  • Editorial Policy
  • Sitemap
  • Terms

Follow Us

No Result
View All Result
  • News
  • Coast To Coast
  • Oil and Gas
  • Maritime Education
  • The Terminals
  • Maritime safety

© 2021 Shippingposition